10/15/2023 0 Comments Union township indianaThe meeting, according to information on the project website, was held in three sessions and offered a virtual option because of COVID-19 precautions in place at the time. 30, 2020, at the county administration building. (Michael Gard / Post-Tribune) (Michael Gard / Post-Tribune) ‘Keeping it under wraps’Īmerican Structurepoint of Indianapolis held a meeting on the project on Sept. A proposed road extension of Willowcreek Avenue would pass through the town with a bridge to be built over the road. Local officials and the project website, meanwhile, said the project, discussed for decades and part of the county’s master plan, is a necessary north-south thoroughfare in west central Porter County, providing connectivity to major highways, alleviating traffic congestion on other roads, tackling drainage problems and providing for future development and road capacity.Ī view looking west down State Road 130 in Wheeler on Friday, July 8, 2022. Union Township residents say the road extension, with a design speed of 55 mph, per the project’s website, will disrupt their rural quality of life with the potential for high-speed traffic, ruin multi-generational farms including the Hardestys’ and destroy the small town feel of Wheeler, among other concerns. In recent weeks, red and green signs have popped up along Indiana 130 through Wheeler and on surrounding rural properties with slogans including “Save Wheeler” and “Keep Willowcreek out of Wheeler!” Residents also started an online petition, directed at Porter County elected and appointed officials, in an attempt to stop the road extension, and have a public Facebook page. No one dreamt it would come this way and down,” Curt Hardesty said. “It’s always been figured it would be (Indiana) 149.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |